This has been a plan that has been talked about for some time. Will it work?....I hope so considering all the taxpayer dollars that have been spent....



Thats my two cents worth for today......Have a great day..
These postings are my personal take on the happenings of Glacier National Park and are not associated with Glacier National Park in any way. You will find that my expectations and beliefs are much more realistic than the news you may be reading else where.



Above average snowpack, a cold spring, and several severe spring snow storms (Say that three times fast) have left the higher elevations of Glacier under deep snow and are presenting challenges to backcountry travel, especially over the high passes.There are few offices in the park that I would put a lot of faith and trust in, but the crew at the back country office is one of them. This group of individuals are lead by the charming Brian McKeon. Actually everyone knows that really the office is ran by mother Kim and Grandma Linda, but they like to let Brian think he is in charge. But then that is a story for another day....
Our melt-out is about two to three weeks behind normal so many of our backcountry campgrounds are not opening on time either. Sustained summer heat has finally allowed 24 hour snowmelt and our hope is that this will facilitate more backcountry campground openings in the near future.
Along with this melt-out however, comes high water hazards and possible undercut snowbanks. High angle snow slopes finish out the troika of risks associated with Glacier's current backcountry conditions.
During the next few weeks, backpackers wishing to venture into the high country should be familiar with swift water crossing techniques and well versed in the use of an ice ax and crampons and possess the ability to self-arrest.

The Going-to-the-Sun Road should open to through traffic for the entire 52 mile length pending an inspection of the road this morning.
We now had to sit and wait for the pilot truck to come back and guide us through the single lane. There was no construction going on anywhere that I could see. At least here they had placed barriers on the outside edge of the inside lane, just visible signs that something was going on. It appeared the complete outside lane was gone and it felt to me as we were just hanging onto a very narrow ledge with a loose gravel surface. It was not a pleasant experience! We waited for 10-15 minutes for out turn to proceed. The rest of the ride to Big Bend was under the same conditions.
There was not much low snow lying around. However the views were spectacular with mountain goats on the hillsides. Lots of water running and still lots of snow higher up.
As you can see there is a lot of water coming out of the weeping wall and onto the roadway.